By Brad Poke ·
Editorial status: expanded guide awaiting Radar business/compliance review. The byline and original publication date above are retained from the existing article record; they do not confirm that the named author has reviewed this revision.
This is general information for UK businesses, not personal insurance or legal advice. Cover depends on the insurer's wording, schedule, endorsements, exclusions and your circumstances. Examples are hypothetical, not claims outcomes or promises of payment.
Where should a contractor start?
Construction insurance is not one standard policy that covers every site risk. Start with what you do, who works for you, what property could be damaged and what your contracts require. A sole trader carrying out decorating work has different exposures from a contractor taking responsibility for structural design, demolition or hired machinery.
This guide explains common insurance questions for UK contractors. The statutory employers' liability and CDM explanations below refer to Great Britain (England, Scotland and Wales). Northern Ireland has separate legislation: obtain jurisdiction-specific advice rather than applying these summaries automatically. Overseas projects also need separate consideration.
When is employers' liability insurance required?
In Great Britain, most employers must arrange employers' liability (EL) insurance with an authorised insurer for at least £5 million. GOV.UK also explains the requirement to display the certificate where employees can access it and show it to inspectors [1]. The minimum is a legal floor, not a recommendation that it is enough for every contractor.
Do not decide worker status from a label alone. HSE explains that the real working relationship, including your control over the work, matters; describing someone as self-employed for tax purposes does not settle the insurance question [2]. Discuss labour-only subcontractors, casual workers and apprentices with your broker before they start.
There are limited exemptions. HSE notes that the family-business exemption does not apply to incorporated limited companies and describes a separate exemption for a company whose only employee owns at least half its issued share capital [2]. Do not assume an exemption applies simply because the business is small or family-run. Verify your circumstances and the current requirements.
What does public liability do?
Public liability addresses covered claims by third parties for injury or property damage connected with your activities [3]. For example, a member of the public might allege that your work damaged their property. It is different from EL, which concerns employees. Public liability is generally voluntary, but a customer or main contractor may insist on it and specify limits [2].
Ask whether all your activities are declared, including work at height or depth, heat work, excavation, demolition and work at unusual premises. Check exclusions, excesses, subcontractor conditions and any requirement for permits or precautions. Do not assume liability insurance pays to redo defective work itself, or that it covers every item you are working on. Ask how the wording treats rectification and resulting damage.
What about the works, existing buildings, tools and plant?
Ask about contract works cover for accidental loss or damage to work in progress and materials. The title of the cover is not enough: confirm the insured parties, project value, location, period, exclusions and the point at which cover ends. Existing buildings, completed work and property belonging to the client need explicit consideration rather than an assumption that everything on site is included.
For tools and plant, distinguish your own equipment from hired-in equipment and the liability you accept under the hire agreement. Ask about theft from vehicles, overnight storage, unattended sites, security requirements, breakdown and continuing hire charges. These are wording-specific questions, not guaranteed inclusions. Motor insurance and cover for tools carried in a vehicle are not interchangeable.
If you have premises, stock or workshop equipment, consider commercial property cover separately. The ABI explains the distinction between buildings and contents and advises insuring buildings for rebuilding cost rather than sale value [4]. Do not use the purchase price of premises as a substitute for a suitable rebuild assessment.
Do contractors need professional indemnity?
If you design, specify, advise or take contractual responsibility for design, discuss PI even if most of your work is physical construction. PI concerns claims arising from negligent professional services or advice and is usually claims-made [5]. Ask about the insured services, retroactive date, notification requirements and continuity of cover for completed work. Consider run-off arrangements before cancelling when the business closes or stops designing.
A design-and-build obligation or warranty can extend beyond what your insurance covers. Have unusual contract terms reviewed before accepting them; a certificate does not prove that every contractual liability is insured.
How should I compare quotes?
Give the broker an accurate description of trades, turnover, payroll, subcontracting, project sizes and durations, locations, claims history and higher-risk operations. Tell them about design responsibility, hired plant and work outside your usual activities. Compare the full wording, schedule and endorsements as well as premium.
Check whether limits apply per claim, per event or in total; whether defence costs reduce the available limit; and which excesses and sub-limits apply. Confirm whether the policy is annual or project-specific and how changes, overruns, handover and maintenance periods are handled. There is no universal package, price or limit that this guide can recommend.
What should I do before work starts or if something goes wrong?
Agree who insures the works and existing property, check contractual requirements and keep policy documents available. Keep records of subcontractor insurance, inspections and agreed precautions where required. Under CDM 2015, contractors must plan, manage and monitor their work, ensure suitable supervision and take account of risks to workers and others. A sole contractor must ensure a construction phase plan is prepared before setting up the site [6]. Insurance does not replace these duties.
After an incident, prioritise safety, obtain emergency assistance if needed and make the site safe where possible. Record facts, photographs and witness details without putting people at risk. Notify the insurer promptly under the policy instructions, preserve evidence and check before admitting liability, settling or undertaking non-emergency repairs. Statutory incident-reporting duties are separate from insurance notification; seek competent advice on what applies.
Sources and limitations
[1] GOV.UK — Employers' liability insurance: minimum cover, authorised insurer and certificate obligations.
https://www.gov.uk/employers-liability-insurance
[2] HSE — Employers' Liability (Compulsory Insurance) Act 1969: a brief guide for employers. Supports worker-status and exemption explanations. This older leaflet contains legacy regulator contact details; use the current GOV.UK page for authorisation checks.
https://www.hse.gov.uk/pubns/hse40.pdf
[3] Association of British Insurers — Public liability insurance: scope of third-party injury/property claims.
https://www.abi.org.uk/policy-and-guidance/general-insurance/business-insurance/liability-insurance/public-liability-insurance
[4] Association of British Insurers — Commercial property insurance: buildings, contents and valuation.
https://www.abi.org.uk/products-and-issues/choosing-the-right-insurance/business-insurance/commercial-property-insurance/
[5] Association of British Insurers — Professional indemnity insurance: professional services, claims-made cover and run-off.
https://www.abi.org.uk/policy-and-guidance/general-insurance/business-insurance/liability-insurance/professional-indemnity-insurance
[6] HSE — Contractors: roles and responsibilities under CDM 2015.
https://www.hse.gov.uk/construction/cdm/2015/contractors.htm
Sources checked on 11 October 2026. This is a source-check date, not a publication date or business approval. The contract works, plant and restriction checklists are questions for your insurer, not verified features of a Radar product. Business/compliance review of the statutory summaries and all coverage descriptions is required before this revision is treated as approved customer advice.